US Construction Takeoffs

Precision construction quantity takeoffs

We audit architectural and structural drawing sets to produce verified line-item material schedules. Get bid-ready Excel files delivered ahead of your submittal deadline without adding full-time overhead.

Operational Standards

Engineered for tight bid schedules

24-48 hrs

standard turnaround window

16

CSI divisions covered

100%

drawing callout mapping

Core Deliverables

Technical estimating scopes

Every project sheet is measured, cross-checked against specifications, and delivered in structured tabular formats ready for immediate trade markups.

Material Quantities
CSI Structuring
Subcontractor Scope

Quantity Takeoffs

Material Measurement Sheets

Bid Package Prep

Complete linear footage, surface square yardage, and cubic volume counts extracted directly from architectural plans, structural notes, and schedule details.

Organized spreadsheets itemizing concrete pours, drywall assemblies, framing lumber packages, and MEP runs according to master CSI division codes.

Comprehensive summary audit sheets with marked-up PDF drawing sets showing color-coded takeoff layers so your field estimators can verify all figures.

Workflow

From PDF plans to bid sheet

01
02
03

Submit Drawing Package

Scope Audit and Quote

Receive Bid-Ready Files

Provide your PDF blueprint link, specified trade scope, addenda notes, and required bid deadline date through our intake desk.

We review sheet counts and drawing complexity within two hours to return a fixed fee proposal and confirm delivery timing.

Receive itemized Excel takeoff schedules alongside marked-up PDF verification sheets, ready for your unit pricing input.

Plan Intake

Submit drawings for quote

Attach drawing download links, specify required trade divisions, and share your submittal deadline. You receive fixed fee confirmation within two business hours.